
New TopShim run:

version = topshim 2.4.0
date = 2024-10-11
time = 12:30:11.151
command = topshim  convcomp tuneaxyz

FINE SHIMMING

Parameters:

probe = Z116098_0395
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 3.3 Hz, Target= 0.6 Hz, After= 0.7 Hz
Iteration  2: FWHM Before= 0.7 Hz, Target= 0.3 Hz, After= 0.6 Hz
Iteration  3: FWHM Before= 0.6 Hz, Target= 0.7 Hz, After= 0.6 Hz
Iteration  4: FWHM Before= 0.6 Hz, Target= 0.4 Hz, After= 1.0 Hz
Iteration  5: FWHM Before= 1.0 Hz, Target= 0.5 Hz, After= 0.4 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.632


Performing tune after shimming
tune lock level increase = 1.4

shim changes: 
Z	-39
Z2	-58
Z3	+109
Z4	-275
Z5	+46
X	+136
Y	+135

duration = 3 min 50 sec
completed successfully
finished Fri Oct 11 12:33:59 2024


========================================================================
